Structural steel · Pre-engineered buildings

From drawing to building.

We fabricate structural steel to your plans. We also design and supply complete steel buildings. Everything ships in the order you build.

  • AISC Certified
  • IAS AC472 accredited
  • Shipped to 41 states
  1. 01Foundation
  2. 02Main frames
  3. 03Secondary
  4. 04Roof & walls
  5. 05Doors & trim
  6. 06Erection

01Your contractor

Foundation

Your contractor pours the slab. We send the anchor-bolt plan and column loads early, so it's ready before steel arrives.

02We engineer & build

Main frames

Tapered columns and rafters, designed for your loads and local code. Made in our shop, bolted together on site.

03We supply

Purlins, girts & bracing

Cut and punched to fit. No drilling in the field.

04We supply

Roof & walls

Standing-seam roof, ribbed wall panels, trim and fasteners. In your colors.

05We supply

Doors & trim

Roll-up and walk doors, gutters, downspouts and trim. All in the same package.

01Services

Two ways to work with us.

Pick the one that matches where your project is today.

Welder fitting a stiffener into a primed steel column You have drawings

Structural fabrication

Send your structural drawings. We detail, cut, drill, weld and coat every piece, then ship it ready to bolt up.

  • Detailing & shop drawings
  • Connection design, if you need it
  • Cutting: saw, plasma, laser
  • Drilling & punching
  • Welding to AWS D1.1
  • Primer, paint or galvanizing
  • Delivery in erection order
  • Erection support
Upload your plans
Crane setting a primed rafter on a steel building frame You need a building

Pre-engineered buildings

Tell us the size, use and location. We engineer the whole building and ship every part, from frames to trim.

  • Design & stamped engineering
  • Main frames
  • Purlins, girts & bracing
  • Roof systems
  • Wall systems
  • Doors, trim & accessories
  • Delivery to your site
  • Erection support
Get a building quote

Not sure? Have stamped structural drawings? Start with fabrication. Need the building designed? Start with a building quote.

WarehousesManufacturing plantsAircraft hangarsFarm & equipmentTruck & auto dealersSports facilitiesCold storageSelf-storageChurchesOffices & retail

02What's included

Know exactly what's in the box.

Every part, and who handles it. Hover a row to find it in the building.

  • Design & engineering

    Stamped by a licensed engineer in your state.

    Your engineer of record designs it. We can add connection design.

  • Drawings

    Approval, anchor-bolt, shop and erection drawings.

  • Main frames

    Columns and rafters, primed.

    Beams, columns and braces, to your drawings.

  • Purlins, girts & bracing

    Cut and punched to fit.

    Whatever's on your drawings: joists, girts, bracing, misc. steel.

  • Roof & wall panels

    Panels, trim, fasteners, sealant.

    Not part of a fabrication job.

  • Doors & accessories

    Roll-up and walk doors, gutters, vents, insulation.

    Not part of a fabrication job.

  • Delivery

    Our trucks, loaded in your erection order.

  • Erection

    Your erector, or one from our certified network.

  • Foundation & site work

    By your contractor. We give them the bolt plan and column loads.

03Projects

Built at every size.

Slide to your building's size. We'll show what we've built close to it.

40,000 sq ft

We've built 180+ projects within 25% of this size.

Distribution warehouse with dock doors at dusk

Building packageShreveport, LA

Red River Distribution Center

Size
212,000 sq ft
Steel
1,480 tons
Spans
3 × 100'
Approval to steel
14 wks
Close match
Aircraft hangar with its large door open

Building packageWichita, KS

Hangar 4, Jabara Airfield

Size
32,400 sq ft
Steel
390 tons
Clear span
180'
Approval to steel
10 wks
Close match
Inside a clear-span steel plant with primed frames

Building packageGreenville, SC

Halcomb Precision Plant

Size
96,000 sq ft
Steel
820 tons
Crane
25-ton runway
Approval to steel
12 wks
Close match
Four-story structural steel frame under construction

FabricationTulsa, OK

Mercy West Medical Offices

Size
86,000 sq ft
Steel
640 tons
Frame
4 stories
Approval to steel
9 wks
Close match
Indoor sports facility lit up at dusk

Building packageFort Wayne, IN

Lakeside Sportsplex

Size
54,000 sq ft
Steel
520 tons
Clear span
200'
Approval to steel
11 wks
Close match
Frames going up on a cold storage warehouseIn erection

Building packageSalina, KS

Sable Creek Cold Storage

Size
60,000 sq ft
Steel
450 tons
Panels
Insulated
Approval to steel
10 wks
Close match
Truck dealership with a glass showroom

Building packageAmarillo, TX

Northgate Truck Center

Size
24,000 sq ft
Steel
190 tons
Service bays
8 drive-through
Approval to steel
9 wks
Close match
Equipment barn in farm fields

Building packageAmes, IA

Tri-County Equipment Barn

Size
9,600 sq ft
Steel
58 tons
Clear span
80'
Approval to steel
5 wks
Close match

04Capacity

Big enough for the big jobs.

Two plants, our own trucks, and room on the schedule.

  • 36,000tons of steel fabricated a year
  • 410,000sq ft of shop under crane, in two plants
  • 300'clear span, no interior columns
  • 38trucks in our own fleet
Plants: Tulsa, OK and Chattanooga, TN Projects shipped, 2019 to 2026 Next-day truck range
Beam feeding through a CNC drill line
CNC beam drill line
Plasma table cutting base plates
Plasma & laser cutting
Primed rafters in the paint bay
Paint bay
Flatbed loaded with primed steel leaving the plant
Our own fleet

05Schedule

A schedule you can build around.

A typical 20,000 to 60,000 sq ft building. Steps overlap, so steel reaches your site sooner.

Quote & scope2 to 5 days

Send plans or a size. You get a price and a scope sheet.

Approval drawings1 to 2 weeks
You sign off

You check and sign. This locks the design.

Engineering & detailing2 to 3 weeks
Bolt plan to your contractor

Stamped calcs and shop drawings. Your crew can start footings now.

Fabrication3 to 6 weeks

Cut, drilled, welded, primed and inspected.

Delivery in sequenceOn your dates
First truck on site

Loads leave in erection order.

Erection supportUntil it's closed in

Your PM answers the phone. Field fixes ship in 48 hours.

“Can you meet our delivery sequence?”

Yes. We fabricate and load in the order your crew erects. Every truck leaves with a load list and piece marks, so nothing sits in the mud waiting for the piece underneath it.

  1. Load 1Frame lines 1 to 3, bracingMon
  2. Load 2Frame lines 4 to 6Tue
  3. Load 3Frame lines 7 to 9, endwall columnsWed
  4. Load 4Purlins, girts, eave strutsFri
  5. Load 5Panels, trim, doorsTue

06Quality

Checked before it ships.

Every piece goes through the same five checks. Here's what that looks like on one beam.

Anchor-bolt plan for a 120 by 200 foot building
  1. 1

    Material traced

    Every beam and plate is tied to its mill cert by heat number.

  2. 2

    Fit-up checked

    Length, holes and plates checked against the shop drawing before welding.

  3. 3

    Welds inspected

    100% visual by a certified weld inspector. Ultrasonic tests on full-penetration welds.

  4. 4

    Coating measured

    Primer thickness read on every piece.

  5. 5

    Marked & photographed

    Piece mark and load number on every piece, photographed before it's loaded.

Inspector testing a weld with an ultrasonic probe
Ultrasonic test on a moment connection, Tulsa plant.

07Questions

Straight answers.

Do you handle projects of this size?

Most likely. We build from 2,000 to 400,000 sq ft and fabricate jobs up to 3,000 tons. Send your plans and we'll tell you within two business days.

Are drawings and engineering included?

For a building package, yes: stamped design, approval drawings, anchor-bolt plan and erection drawings. For fabrication, we detail your engineer's design and can add connection design.

Do you supply only, or also erect?

Both. Buy supply-only, or add erection through our network of certified erectors. Either way you get one project manager and field support.

Can you meet our delivery sequence?

Yes. We fabricate and load by your erection sequence. Every truck leaves with a load list and piece marks.

What's not included?

Foundations, site work and permits. We give your contractor the anchor-bolt plan and column loads they need, early.

08Start

Start with your plans, or just a size.

A person reads every request. You'll hear back within two business days.

We need a about ft wide × ft long × ft tall in . We're and need steel on site by .

Scope

Concept page: this form doesn't send anything.

Concept site by Figured Media. Not a real business.