Kitchens & bathrooms · Design + build · Fairfield & Westchester

The room you approve is the room you get.

We design, source and build premium kitchens and bathrooms. One team, one fixed schedule, one person to call.

A finished kitchen with limed oak cabinets, a Calacatta marble waterfall island and brass pendant lights

01What we do

One team for the whole room.

Nine jobs, one contract. Pick any one to see where it shows up in your room.

ADesign

BMake

CBuild

A · DesignDesign consultation
Revised layout · 1:50
Limed oak · Calacatta · brass
Week 7 of 9Stone installed · tile starts ThursdayOn schedule

02Choosing finishes

Too many choices? We bring you three.

Tell us what you like. We come back with three palettes that already work together — and you hold every sample before anything is ordered.

The same kitchen shown in three finish palettes

Same room. Three palettes.

  1. 1

    Style chat

    Ten minutes on what you love and what you don't. Bring photos if you have them.

    Week 1
  2. 2

    Three palettes

    Cabinet, stone, metal, tile and floor — chosen to work together.

    Week 2
  3. 3

    Sample review

    Hold every sample at the showroom. See the actual stone slab before it's cut.

    Week 3
  4. 4

    Approve in one tap

    Every choice is saved in your portal. Nothing is ordered without your yes.

    Week 4

03Room stories

Drawn, then built. Side by side.

The Alder Road kitchen, Darien. A 1990s kitchen reworked for a family of five — from the first visit to the last touch-up.

The Alder Road kitchen after the renovation
The same kitchen before: honey-oak cabinets and hanging cupboards over the island
BeforeAfter

01 · Before

Cupboards hung over the island. One small window.

The room had space. It just didn't feel like it. Drag to compare.

Floor plan changing from the original layout to the revised layout 1 2 3 4 5.2 × 6.4 m

02 · The plan

Four moves opened the room.

  1. 1Hanging cupboards out. A floor-to-ceiling pantry wall in.
  2. 2Back window three times wider.
  3. 3Range centred on the left wall, under a plaster hood.
  4. 4Island stretched to 3.2 m, with a waterfall end.
The finished kitchen
The approved design drawing of the same kitchen
Drawing · MarchRoom · August

03 · Drawing vs. room

What you sign off is what gets built.

Same veining. Same knobs. Same light. Drag the line — we'll wait.

Pull-out pantry in white oak
Pull-out pantry
Plate drawer with oak pegs
Plate drawer, oak pegs
Appliance garage with pocket doors
Appliance garage
Dovetailed oak drawer box
Dovetailed drawers

04 · Storage

+40% storage. Nothing on the counters.

Every drawer was planned around what goes in it — plates, pans, the coffee machine.

Mitred marble waterfall edge with continuous veining
Unlacquered brass knob on an oak drawer
A cabinetmaker scribing an oak door panel

05 · Materials & craft

Veins that turn the corner.

The island's end was cut from the same slab, so the pattern runs unbroken. Unlacquered brass that darkens with use. Oak scribed by hand.

06 · Result

  • 5weeks of design
  • 8weeks ordering — family still cooking
  • 9weeks on site
  • 2days early at handover
“They showed us the drawing in March. In August the room looked exactly like it — down to the veining.”Claire & Tom R., Alder Road

04How we build

No surprises. Here's how.

Renovations go wrong in three places: late materials, trades in the wrong order and silence. We fixed all three.

Weeks 1–5 · Design

Decide everything on paper first.

Survey, layout, palettes, samples, drawings. You get a fixed price only when every choice is made.

Fixed price$186,400
Selections42 of 42 approved

Weeks 6–13 · Ordering

We order everything first.

Nothing gets torn out until every cabinet, slab, tap and tile is in our warehouse. You keep cooking in your kitchen the whole time.

  • Cabinets built in our workshopWk 11
  • Stone slabs tagged with your nameWk 8
  • Taps & sinkWk 9
  • TileWk 10
  • LightingWk 12
  • AppliancesWk 12

Start date lockedMon 3 June

Weeks 14–22 · Build

Trades arrive in the right order.

We book and supervise every trade, so nobody waits on anybody. Dust walls go up on day one. The site is swept every evening.

Protect & strip out
Plumbing & electrical
Inspection
Walls & ceilings
Cabinets
Stone template → install
Tile & backsplash
Fixtures & lighting
Paint & deep clean
Wk 13579

Every Friday · Communication

You hear from us every Friday.

Your project manager writes what got done, what's next, and anything we need from you. Always before 4 p.m.

JM
Jonah · Project managerFriday, 4:02 p.m.
On schedule

Done this weekCabinets installed and levelled. Island set.

Next weekStone templating Tue 9am. Backsplash tile starts Thursday.

Needs youApprove the hood plaster colour by Monday.

Final week · Handover

Finished means finished.

We walk the room with you, list anything that isn't perfect and close it within ten days. Then a two-year warranty on our work.

  • Adjust pantry door hinge
  • Touch up paint above hood
  • Replace scratched outlet cover
  • Seal grout on backsplash

4 of 4 closed in 6 days

05Your project portal

Every choice, approval and invoice. One place.

  • Approve finishes with one tap
  • See every delivery date
  • Pay invoices tied to finished work
  • Track the last few fixes to done

Alder RoadKitchen · Week 7 of 9

Overall78%

Selections 42 items · 41 approved

  • Cabinet finishLimed white oak, satin
    Approved
  • Island stoneCalacatta, slab 14B · 30 mm honed
    Approved
  • KnobsUnlacquered brass, 25 mm · ×48
    Approved
  • Hood plasterLimewash, 'Oat' · sample 3
    Awaiting you

Approvals 1 waiting

Hood plaster colourSample 3 of 3 · seen at site visit Tue

Approved items are ordered the same day. Nothing is ordered without your yes.

Deliveries 6 of 7 in our warehouse

  • Taps & sink9 Oct
  • Tile11 Oct
  • Cabinets14 Oct
  • Stone (templated 17 Oct)21 Oct
  • Appliances22 Oct
  • Lighting23 Oct
  • Hood plasterafter approval

Invoices Tied to finished work, never dates

  • 1 · Design sign-off$18,640Paid
  • 2 · Materials ordered$55,920Paid
  • 3 · Cabinets installed$46,600Due 30 Oct
  • 4 · Stone & tile done$46,600Later
  • 5 · Handover$18,640Later

Completion items 3 of 4 closed

  • Adjust pantry door hinge
  • Touch up paint above hood
  • Seal grout on backsplash
  • Replace scratched outlet coverThu
Stone slab 14B approved

06People & showroom

Meet your designer. Hold the samples.

You work with one designer from the first visit to the final walkthrough. Everything they suggest, you can touch at the showroom.

Portrait of Maren Holt

Maren Holt

Kitchen design lead · 16 years

“I start with how you cook, not with cabinets.”

Portrait of Theo Lind

Theo Lind

Bathroom designer · 11 years

“Most of a great bathroom is hidden: slopes, valves, waterproofing.”

Portrait of Ada Mensah

Ada Mensah

Design director · 22 years

“Every drawing we hand you is one we know we can build.”

The Honed showroom with full kitchen displays and a material library

The showroom

Six full rooms to walk through.
400+ samples to take home.

Address
48 Mill Street, Westport, CT
Open
Tue–Fri 10–6 · Sat 10–4
Parking
Free, right outside
Book a showroom visit

07Investment

What it costs. Straight answers.

Real ranges from our last 60 projects. Your fixed price comes after design — and it doesn't move.

Powder room3 weeks on site
$30k–$55k
Guest bathroom4–5 weeks on site
$55k–$95k
Primary bathroom6–8 weeks on site
$95k–$180k
Kitchen8–12 weeks on site
Most land here
$150k–$320k

Included

Design, cabinetry, stone, fixtures, every trade, permits and project management.

What moves the price

Moving walls or plumbing, custom cabinetry detail, the stone you fall for, appliances.

Design fee

$4,500 for the full design phase — credited in full when you build with us.

08Reviews

4.9★★★★★212 reviews on Google & Houzz

“They showed us the drawing in March. In August the room looked exactly like it — down to the veining.”

Claire & Tom R. · Kitchen · Darien

“Every Friday we got an update. We never once had to chase anyone.”

Priya S. · Primary bath · Rye

“Nothing was torn out until every piece was in their warehouse. We cooked in our old kitchen until the day demo started.”

David K. · Kitchen · Westport

“Three palettes instead of three hundred samples. It made the decisions easy.”

Hannah L. · Kitchen + two baths · New Canaan
01 / 04

09Start here

Book a kitchen or bathroom design consultation.

Six quick questions, then where to reach you. Your designer calls within one business day.

1 / 7

Which rooms?

Pick all that apply.

Where's the property?

We work across Fairfield County and lower Westchester.

How big a change?
Which feels most like you?

Just a starting point. Pick up to two.

What budget are you working with?

A kitchen with us is usually $150k–$320k. A primary bath, $95k–$180k.

When would you like to start?
Where should we reach you?
Concept site by Figured Media. Not a real business.